Buying Guide
New build vs. renovation: buying sinks and commodes.
The fixtures might be the same, but when you order them changes a lot.
At a glance
New build
Plumbing positions are decided from scratch, so fixtures can be chosen early and the plumbing designed around them, giving more flexibility on type and layout.
Renovation
Existing plumbing positions often constrain what's realistically achievable without additional work, so confirming what can move (and what can't) comes before choosing fixtures.
Timing
When to order either way.
In both cases, order once measurements and plumbing positions are confirmed but before final pipework is completed. See our installation considerations guide for more detail.
New Build
Buying for a new build: what to settle first.
In a new build, nothing is fixed yet, so the order you decide things in matters. Settle the type of each fixture early, because the plumbing, the frames and the tiling all follow from it. A wall-hung commode, for example, needs a supporting frame and a concealed cistern fixed before the wall is finished, and that has to be planned before tiling begins, not after.
Give your plumber and tiler the model details as soon as you have them, so that waste and supply positions are set for the actual pieces rather than for a generic fixture. See wall-hung toilets, concealed cisterns and installation considerations.
Renovation
Buying for a renovation: constraints and checks.
A renovation starts from what is already there, and the existing plumbing decides what is easy. The first thing to find out is whether your waste goes into the floor or the wall, because a commode's outlet has to match it; see P-trap vs S-trap. Moving a waste pipe is possible, but it involves more work and cost, so many renovations keep fixtures close to where they are.
Check the walls before you plan wall-hung pieces, because a wall-hung basin or commode needs a wall that can carry the weight, or room for a frame. Check the floor and the clearances, and think about the order of works if the household has only one bathroom.
The Order of Events
A sensible order of events.
First, plan the layout and decide the type of each fixture. Second, measure the room and check the plumbing; our measuring guide shows how. Third, confirm the exact models and get a written quote. Fourth, place the order, ideally once the positions are confirmed but before the final pipework and tiling are completed. Fifth, check each piece on delivery before signing. Sixth, let the plumber fit the frames and pipework, then tile, then fit the finished pieces.
Mistakes to Avoid
Four mistakes worth avoiding.
Ordering a commode before checking the outlet type. Leaving the wall-hung decision until after tiling. Not allowing for plumbing changes in the budget. Signing for a delivery without checking the pieces. Each of these is easy to avoid with a little planning, and each can be expensive to fix later. For pricing, see bathroom fittings price in Sri Lanka.
Questions
Common questions.
Is it easier to choose fixtures for a new build or a renovation?
Generally a new build, since plumbing positions haven't been fixed yet and can be planned around the chosen fixtures.
What should I confirm first in a renovation?
What can realistically be moved in the existing plumbing without significant extra work, before choosing fixture types.
When should I order sinks and commodes for a new build?
Once the types and positions are confirmed, but before the final pipework and tiling are completed. Give the plumber the model details early so positions are set correctly.
Can I change to a wall-hung commode after tiling?
It is difficult, because the supporting frame and wall work come before tiling. Decide on wall-hung before the wall is finished.
How do I find out whether I can move the waste in a renovation?
Ask your plumber to inspect it. Moving a waste pipe usually involves more work and cost, so keeping fixtures near the existing waste line is often the practical choice.
What should I check when the order is delivered?
Check each piece before you sign and report any transit damage immediately, so it can be looked into.